IT experts is well aware of the importance of software development life cycle (SDLC) in developing their Information Systems (IS). No matter what the emphasis of an SDLC methodology is, they all have these 4 main elements, planning, analysis, design and implentation. The sucess of the IT project depends on the capability of both system analyst and project manager to cover all the details needed in each phase.
A feasibility study will be prepared in the planning stage to understand the business need. The project manager will make a work plan and staff the project once the project feasibilty is approved.. A methodology is chosen as well to aid the project manager in controlling the whole project. A project plan must be prepared after all has been done and approved. A project manager must be well trained in terms of managing a project such as the training Project management training UAE can do.
After the planning, analysis must be done. This phase will focus on the user identification, system specifications, module submission dates and the IS location analysis. A new system concept will be developed in this phase.
Design phase will follow the analysis phase closely. This phase will see to the hardware and software as well as the network infrastructure. It focuses on the user interface such as the forms and reports as well as the database design. The system analyst will provide the deliverables in both analysis and design phases .
The last but certainly not the least is the implementation. This is the longest and most expensive phase that is why the project manager must put extra attention on this phase. The project manager must see to it that everything is within the time limit as the longer the IS is installed, the more the company will spend.
The project manager must be a PMP trained individual to know the ups and downs of managing an IT project. PMP training UAE can give training. The more knowledgeable the project manager would be, the higher rate of success the IT project will have.
No comments:
Post a Comment